
SCR-0383
Fire sprinklers
Design, installation, inspection and maintenance of commercial and industrial sprinkler systems, laid out by a NICET Level IV department.
Fire sprinklers, in detailRegistered SCR-0383 · ACR-2460 · ECR-1366 · one crew, five lines
A commercial building carries several separate fire protection systems, and each one is inspected on its own schedule. Automatic Sprinkler of Texas designs, installs, inspects, tests, maintains and repairs all five of them under three Texas certificates of registration held by one company.
Splitting sprinkler, alarm, extinguisher, lighting and monitoring across four vendors means four service records, four renewal dates and four different numbers to call when something reads wrong on a panel. A facilities manager working to an AHJ deadline does not need four vendors' paperwork reconciled against each other. One registered contractor holds the whole record, and the technician who answers the call already knows what is behind the ceiling tile from the last visit.
Five lines, five registration marks, one inspection history

SCR-0383
Design, installation, inspection and maintenance of commercial and industrial sprinkler systems, laid out by a NICET Level IV department.
Fire sprinklers, in detail
ACR-2460
New systems, upgrades to existing panels, routine inspection and testing, and repairs that keep the system answering when it is called.
Fire alarms, in detail
ECR-1366
Sales, inspection, maintenance, recharging and replacement, with the placement across the building checked as carefully as the cylinders.
Fire extinguishers, in detail
EXIT PATH
Emergency lighting and exit signs installed, inspected, tested and repaired, so the way out is readable when the power is not there.
Emergency lighting, in detail
SUPERVISED
Continuous supervision of fire alarms and supervisory devices, with prompt notification the moment a signal changes.
Alarm monitoring, in detailTwenty-plus years of modular fire protection, no separate line item
The five lines above are what get sold. They are not the whole of what gets built.
See the dated recordFlammable and combustible liquid storage does not respond to water the way an office building does. Special hazard systems and foam suppression, including Chemguard foam bladder tanks, have gone into refinery, pipeline and chemical distribution sites for over a decade.
Site-wide water supply for fire protection, including a 4,200-foot run of HDPE underground main installed for a pipeline client, is the part of the system nobody sees once the trench is closed.
Testers licensed with the TNRCC confirm that a fire protection water supply cannot contaminate the potable supply it connects to. It is a required test, not an optional one, on most commercial systems.
More than twenty years of protecting modular and prefabricated buildings, from a single classroom addition to several thousand floors of FEMA emergency housing, as a member of the Modular Building Institute.
SCR-0383 · ACR-2460 · ECR-1366
Estimates are free. If more than one of these five lines needs attention, say so when you call. It is usually one visit either way.